Role Description: Geotechnical Engineer The purpose of this exercise is to negot

Role Description: Geotechnical Engineer The purpose of this exercise is to negotiate a settlement to the dispute in Case VI from Chen (1988).  You may make the following assumptions: The case is in mediation. The state of Colorado spent $850,000 to correct surface drainage problems around the facility and to repair interior walls and floors damages by swelling soils. The contractor has […]

1.1 Coursework Overview The assessment requiresyou to develop BIM-based solution

1.1 Coursework Overview The assessment requiresyou to develop BIM-based solution for a given project, which will be presented and illustrated to you in the early sessions of the module. You need to critically analyse the project and evaluate potential digital solutions for the challenges encountered with the planning and management of the project. To this end, the planning and management […]

Search in internet bad comments about real estate maintenancing companies in Rig

Search in internet bad comments about real estate maintenancing companies in Riga, are there many bad comments and make statistic which companies has most of negative comments. Find wost real estate maintenancing websites and explain in presentation why they are the worst and what should be upgraded there. Take a look around social media are there any real estatet maintenancing […]

Coursework Tasks to be Completed by Students  The submission should be structure

Coursework Tasks to be Completed by Students  The submission should be structured as follows:   Commence by contextualising key strategic targets across the Architectural, Engineering and  Construction (AEC) industry in relation to the use of BIM and Modern Methods of Construction.   In the main body of the report the student should make use of a range of quality academic […]

Coursework Tasks to be Completed by Students  The submission should be structure

Coursework Tasks to be Completed by Students  The submission should be structured as follows:   Commence by contextualising key strategic targets across the Architectural, Engineering and  Construction (AEC) industry in relation to the use of BIM and Modern Methods of Construction.   In the main body of the report the student should make use of a range of quality academic […]

Coursework Overview  Literature review: The purpose of this assessment is to for

Coursework Overview  Literature review: The purpose of this assessment is to for students to engage with peer-reviewed  quality academic literature in order to produce an argument critically analysing collaborative working and  the design management process on BIM enabled projects.  3.3 Coursework Tasks to be Completed by Students  The submission should be structured as follows:   Commence by contextualising key strategic […]

Coursework Overview  Literature review: The purpose of this assessment is to for

Coursework Overview  Literature review: The purpose of this assessment is to for students to engage with peer-reviewed  quality academic literature in order to produce an argument critically analysing collaborative working and  the design management process on BIM enabled projects.  3.3 Coursework Tasks to be Completed by Students  The submission should be structured as follows:   Commence by contextualising key strategic […]

The assessment requires you to consider a single existing problem related to poo

The assessment requires you to consider a single existing problem related to poor productivity in the construction industry, relating to one of the 8 forms of lean waste. Once you have selected a single problem and can define the problem in relation to lean waste, you need to critically analyse the potential solutions formulated from the module and provide considered […]